Project Contract Types
Project Delivery Systems vs. Contracting Methods: The two terms that are often referenced interchangeably In construction and...
STH Principal Planner & Scheduler
Nov 1, 20242 min read


CPM and Linear Projects
The importance of CPM and Location Based Scheduling.
STH Principal Planner & Scheduler
Aug 20, 20244 min read


nPlan Case Study - AI at work!
The use of Artificial Intelligence in assessing activity duration risks.
STH Principal Planner & Scheduler
Aug 19, 20243 min read


Planning & Scheduling Fundamentals - course intro video
Planning & Scheduling Fundamentals - course intro Video.
STH Principal Planner & Scheduler
Aug 13, 20241 min read


Critical Path Calculations explained
Critical Path calculations using Critical Path Method.
STH Principal Planner & Scheduler
Aug 13, 20241 min read


Planning - My Top 10 - Planning Basics
My top 10 - planning basics
STH Principal Planner & Scheduler
May 11, 20241 min read


Forensic Schedule Analysis - Delays
The document "AACE 29R-03 - Forensic Schedule Analysis" provides a comprehensive framework for conducting forensic schedule analysis in the context of construction and engineering projects. It outlines a structured approach to analyzing project schedules to identify and quantify delays, determine their causes, and assess the impacts on project timelines.
STH Principal Planner & Scheduler
Mar 28, 20241 min read


The Critical Path Method (CPM)
CPM (Critical Path Method) explained The Critical Path Method In an Activity Diagram, a network of tasks can be set up to show the...
STH Principal Planner & Scheduler
Mar 25, 20243 min read


Time for Change - Best Practices
The document titled 'Time for Change' discusses the legal and practical aspects of time management in construction and engineering projects
STH Principal Planner & Scheduler
Mar 24, 20241 min read


Time Impact Analysis - As applied to construction
The document "AACE 52r-06 - Time Impact Analysis - As Applied to Construction" outlines a method for assessing the time impact of unforeseen events on construction projects
STH Principal Planner & Scheduler
Mar 21, 20241 min read


Project Scheduling?
Extracted and summarised from the PMI Practice Standard for Scheduling - Third Edition- 2019
STH Principal Planner & Scheduler
Mar 15, 20249 min read


Aspects of Delay - Delay Claims
This paper discusses the importance of and role of:
the preparation of the programs, that will become the Contract programs both in relation to Contract provisions and the administration of the Contract ;
the management of time to ensure as far as is possible Contract success;
concepts of float and contingency;
target and gross programs;
some of the more common Contract requirements in respect of delay;
mechanisms for delay analysis; and
cost of delay.
STH Principal Planner & Scheduler
Mar 13, 202428 min read


PSAEG - Planning & Excellence Schedule Guide
Minor delays can cause major cost overruns on complex civil engineering projects The document titled "Planning & Scheduling Excellence...
STH Principal Planner & Scheduler
Mar 8, 20242 min read


GAO - Schedule Assessment Guide
The "GAO-16-89G" Schedule Assessment Guide document outlines best practices for project scheduling, emphasizing the importance of a comprehensive and integrated approach
STH Principal Planner & Scheduler
Mar 1, 20241 min read


Critical Path or Longest Path
The document "Longest Path Value" by Ron Winter discusses the limitations of using Total Float for scheduling and introduces the concept of "Longest Path" as a more effective metric.
STH Principal Planner & Scheduler
Feb 29, 20241 min read


Critical Path Method (CPM) Explained
Scheduling techniques - The Critical Path Method.
The following slides explain the Critical Path Method (CPM)
STH Principal Planner & Scheduler
Feb 29, 20241 min read


Alliances
Best Practice Governance for Alliances https://www.infralegal.com.au/collaborative-contracting/best-practice-governance-for-alliances-an-...
STH Principal Planner & Scheduler
Feb 18, 20242 min read


Primavera P6 Tips #1
Here's a summary of some helpful tips, tricks, and shortcuts for using Primavera P6 software
STH Principal Planner & Scheduler
Feb 17, 20242 min read


Primavera P6 or MS Project?
Primavera P6 or MS Project? Knowing which software to choose for a specific construction scheduling exercise or a specific type of...
STH Principal Planner & Scheduler
Feb 17, 20246 min read


PMI Practice Standard for Scheduling 2007
PMI Practice Standard for Scheduling - 2007
STH Principal Planner & Scheduler
Feb 17, 20241 min read